ABRIDGED DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS FOR WOOD MEADOW II SUBDIVISION

This document extracts the pertinent information for the Wood Meadows II By Laws.

ARTICLE IV - ARCHITECTURAL CONTROL COMMITTEE

        Section 1. 

    "Approval of Building Plan"

    No building shall be erected, placed, or altered on any Lot until the construction plans and specifications and a plot plan showing the location of the structure, have been approved in writing as to harmony of exterior design and color with existing structures, as to location with respect to topography and finished ground elevation, and as to compliance with minimum construction standards by Wood Meadow, Section Two, Architectural Control Committee. A copy of the construction plans and specifications and a plot plan, together with such information as my be deemed pertinent, shall be submitted to the Architectural Control Committee, or its designated representative prior to commencement of construction. The Architectural Control Committee may require the submission of such plans, specifications, and plot plans, together with such other documents as it deems appropriate, in such form and detail as it may elect at its entire discretion. In the event the Architectural Control Committee fails to approve or disapprove such plans and specifications with thirty (30) days after the same are submitted to it, approval will not be required and the requirements of this Section will be deemed to have been fully complied with. 


        
Section 2. 
    
        "Committee Membership"

    The Architectural Control Committee shall be initially composed of John R. Macdonald and Jerrald M. Thomas, Jr. and Henry J. Martyn, III, who by majority vote may designate a representative to act for them.


        Sec
tion 3.

    "Replacement"

    In the event of death or resignation of any member or members of said committee, the remaining member or members shall appoint a successor member or members, and until such successor member or members shall have been so appointed, the remaining member or members shall have full authority to approve or disapprove plans, specifications and plot plans submitted or to designate a representative with like authority.


        
Section 4. 
    
        "Minimum Construction Standards"

    The Architectural Control Committee may from time to time promulgate an outline of minimum acceptable construction standards; provided however, that such outline will serve as a minimum guideline and such Architectural Control Committee shall not be bound thereby.


        Sec
tion 5.

    "Term"

    The duties and powers of the Architectural Control Committee and of the designated representative shall cease on and after ten (10) years from the date of this instrument. Thereafter, the approval described in this covenant shall cease and terminate; PROVIDED, that any time after October 1, 1988, by two-thirds (2/3) vote of the members present and voting, the Wood Meadow Community Improvement Association, may assume the duties and powers of the Architectural Control Committee.